| Status | Operational |
|---|---|
| Capacity (MW) | ~37 reported at opening + 12 MW HPC building added 2022 (figures UNVERIFIED, conflict-prone) Sources: baxtel.com · bdc.is |
| Power source claim | 100% renewable (geothermal/hydro); Arctic free cooling (operator claims) Sources: bdc.is |
| Published PUE | UNVERIFIED |
| Ownership / jurisdiction | Majority: Vauban Infrastructure Partners, France (since Jul 2021); Icelandic origins; earlier Etix Everywhere stake Sources: baxtel.com |
| AI / GPU relevance | HPC-dedicated building; markets AI infrastructure positioning Sources: www.datacenterdynamics.com |
| Verification notes | MW breakdown across sources inconsistent — verify with operator |