Lefdal Mine Datacenter — Lefdal Mine, Måløy
Norway · Operational + expanding
| Status | Operational + expanding |
|---|---|
| Capacity (MW) | 37 operational + 43 contracted under construction; ~200 potential Sources: www.globenewswire.com |
| Power source claim | Hydropower + fjord seawater cooling (operator claim) Sources: www.lefdalmine.com |
| Published PUE | 1.08–1.15 (reported range, varies by source and rack density) Sources: www.datacenterknowledge.com |
| Ownership / jurisdiction | 3i Infrastructure plc (UK) ~€300m majority stake, closing expected summer 2026; previously Columbia Threadneedle ESIF majority; Rittal (Germany) stake Sources: www.3i.com · www.datacenterdynamics.com |
| AI / GPU relevance | Hosts containerized HPC/AI deployments (tenant mix UNVERIFIED) |
| Verification notes | PUE range conflicts across sources; ownership in transition — recheck after 3i close |
Fields marked UNVERIFIED could not be confirmed against a public source. We publish uncertain data as uncertain.