Meta — Luleå campus (3 buildings)
Sweden · Operational
| Status | Operational |
|---|---|
| Capacity (MW) | 723.8 (third-party tracker figure — UNVERIFIED; may reflect total site power not IT load) Sources: dgtlinfra.com · www.datacentermap.com |
| Power source claim | 100% renewable (hydro-rich Luleå grid) — operator claim Sources: datacenters.atmeta.com |
| Published PUE | UNVERIFIED at site level (Meta publishes fleet-wide PUE) |
| Ownership / jurisdiction | Meta Platforms, USA (self-build, sole tenant) Sources: datacenters.atmeta.com |
| AI / GPU relevance | Hyperscale own-use; AI training capacity at site UNVERIFIED |
| Verification notes | 723.8 MW figure needs methodology check — likely grid connection capacity |